Window and door perimeters
Removal and replacement of failed external sealant around frames, sills and interfaces.
Commercial repair work to window perimeters, curtain walling, cladding, façade joints and movement joints. We review the sealant failure first, then confirm whether rope access is the right way to reach it.
Sealant scope
The access method does not change the basics of good joint sealing. The existing material, substrate, joint size, movement and exposure still need to be understood before a product and repair detail are agreed.
Removal and replacement of failed external sealant around frames, sills and interfaces.
Targeted perimeter and interface resealing where access from the ground is not practical.
Failed panel joints and external sealant sections reviewed for removal and replacement.
Joint dimensions, movement demand and existing backing are checked before a repair is specified.
Weather sealing around suitable pipes, ducts and service entries. This does not include fire stopping.
Accessible suspect joints can be recorded and repaired as part of an agreed high level scope.
Choosing access
HSE guidance requires work at height to be planned using a hierarchy of controls. Ground based work and collective protection are considered before personal protection methods. That is why the access decision follows the scope review rather than being made from height alone.
Height, shape, roof access, suitable anchors and the position of the joints all affect the access plan.
A short targeted repair and a full elevation programme need different access, labour and site arrangements.
Entrances, roads, residents, visitors and other trades affect exclusion zones and the working sequence.
Weather exposure, emergency arrangements and a workable rescue plan are reviewed before work starts.
Before pricing
A close photograph shows the joint condition. A wider photograph shows where that joint sits on the building. Both are needed for a useful first review.
Send project photosFrom enquiry to handover
Rescue arrangements are planned before rope access work begins. They are part of the working method and do not rely on the emergency services as the plan.
We review the building, affected joints and available information. If the cause or extent is unclear, a site assessment may be needed.
Rope access, a MEWP or scaffold is considered against the work at height hierarchy and the practical needs of the job.
The quote identifies the sealant work, access method and agreed records. RAMS and rescue planning follow for the confirmed scope.
Failed material is removed and the joint is cleaned. Backing, primer and product requirements are checked for the actual substrates.
Sealant is applied and tooled to the agreed detail. The site contact receives the completion information included in the quote.
Coverage
Suitable projects are reviewed nationwide, including London. Distance, travel, accommodation and access set up are considered when the quote is prepared.
Commercial documentation
Risk assessments, method statements and rescue planning are site specific. Insurance information and agreed completion records can be provided for the job.
Rope access questions
No. The work at height hierarchy, building, duration, reach and area below all matter. A MEWP or scaffold can be more suitable. We review access after understanding the sealant scope.
The work is delivered with an established team of IRATA qualified rope access technicians under Level 3 supervision. Team size is set by the scope, access plan and rescue arrangements.
We can identify visibly failed or poorly bonded sealant in the agreed inspection area. Water can enter through several parts of a building envelope, so sealant repairs should not be presented as a diagnosis where the source has not been established.
Commercial rope access work is planned with site specific risk assessments, method statements and rescue arrangements. Relevant insurance and competence information can be supplied for the project.
Yes. Next Level Sealants is based in Liverpool and reviews suitable commercial rope access projects across the UK. Travel and accommodation are included in the quote where needed.
Often, but it depends on the elevation and the area below. Entrances, paths, car parks and occupied rooms may affect exclusion zones, working hours and phasing.
Have survey photos or a building report?
Send the files with the address and the affected elevation.
Ready when you are
Include wide and close photographs, the address, approximate height and the extent of work. We will review whether rope access is suitable and what else is needed to quote.
Prefer to call? 0151 453 5755